The Harz waterworks intend to carry out a general overhaul of the Sösetalsprerre's front barrier, including the repair of the B498.
In advance, the production of work levels on the barrier dam as well as landscape conservation measures through dams and terrain profiling in drinking water protection zones I and II are required.
Provision is made for the bulk materials to be removed from the storage space floor of the main barrier and front barrier when the water level is lowered, brought into the construction area and poured up as a work plan or barrier barrier. The total dimensions to be relocation are approx. 21,000 m³.
Main services:
- Make work plan from bulk materials main barrier side approx. 4,500 m³
- Make work plan from bulk materials pre-lock side approx. 13,000 m³
- Water retention dam dam barrier approx. 2,000 m³
- Schachtbach water retention dam approx. 50 m³
- sediment removal of Schachtbach and disposal approx. 500 m³
- Terrain profiling and topsoil removal including vegetation cover and disposal approx. 1,000 m³
- Produce driveways and ramps during construction
- Carrying out work within drinking water protection zones I and II