The overall project involves the renovation and extension of a three-field sports hall. The renovation concerns the roof surfaces, the façade surfaces and the interior fittings. In the course of the expansion, a single-storey extension will be built on the east side. On the south side, after the demolition of the old building, a new foyer area is being built for the main development of the three-field sports hall. The technical renovation concerns the heating, ventilation and sanitary facilities as well as the entire electrical engineering.
- 160 m seating grandstand
- 35 m benches
- 110 m² cloakroom wall cladding
- 30 m washbasins made of mineral casting
- 45 m² Spiegelflächen