Supply of electricity to power-metered and non-metered delivery points from 01.04.2023 to 31.12.2024
For the supply of electricity, the client operates the following extraction points at the Elsteraue site, with or without performance measurement:
Electricity sampling points with power measurement (low voltage/medium voltage)
Hauptstraße 30 Administrative Center Building 37 Low voltage
Hauptstrasse 26 Hyzet Culture and Congress Centre Building 50 Low voltage
Hauptstraße 26 canteen construction 61 low voltage
Main road 30 industrial waterworks (BWW) medium voltage
Hauptstrasse 45 Central Wastewater Treatment (ZAB) Medium Voltage
Dr.-Engler-Str. 14 Recooling plant (RKW) medium voltage
Electricity sampling points without power measurement (low voltage)
Hauptstraße 30 Bau 38 East Low voltage
Hauptstraße 28 Bau 38 West Low voltage
Hauptstraße 24 Building 39 Workshop low voltage
Hauptstraße 30 fire tower low voltage
main road 30 parking lot lighting low voltage
Hauptstraße 26 RW pumping station low voltage