This is an award of phases 5-7 or in the engineering structures. The following measures are planned at the VST. New construction of central platform (170m, 76 cm); Renewal of platform equipment incl. wayfinding system; modernization of the PU; Redesign of the staircase according to Ril. 8130202 Design and design platform accesses Version 2.0 – Valid from 01.12.2022; New construction of stair enclosure; New construction WSH; New construction of the elevator shaft
Modernization of traffic station (VST) Rentrisch, BIM planning services for the following service profiles: BIM object planning for traffic facilities Lph 5 to 7, BIM object planning for civil engineering structures Lph 5 to 7 and BIM structural design for civil engineering structures phases 5 to 7