The Electrical Installation Condition Reporting (EICR) works across the Anglia Ruskin University campuses and student residences in Cambridge, Chelmsford, London, Harlow and Peterborough are scheduled to be carried out over a 2024/2025/2026/2027/2028 programme based upon dates taken from preceding electrical test and inspection certificates. The specification identifies what ARU requires, where it is required and how the results are expected to be delivered along with the procedures required for working within an educational establishment both in its non-residential and residential buildings.
The Electrical Installation Condition Reporting (EICR) works across the Anglia Ruskin University campuses and student residences in Cambridge, Chelmsford, London, Harlow and Peterborough are scheduled to be carried out over a 2024/2025/2026/2027/2028 programme based upon dates taken from preceding electrical test and inspection certificates. The specification identifies what ARU requires, where it is required and how the results are expected to be delivered along with the procedures required for working within an educational establishment both in its non-residential and residential buildings.