The Hans Furler Gymnasium Oberkirch is the largest school in the large district town of Oberkirch. The school building, which was built in reinforced concrete frame construction in the mid-1970s, is to be comprehensively renovated in several successive construction phases to meet the requirements of a modern educational institution. The structural modernization includes both the complete interior renovation (incl. building services), as well as energetic refurbishment in the KfW 70 standard. This is carried out simultaneously in compliance with school operations.
Plaster and ETICS
The service includes the application of a mineral top coat and a sol-silicate coating on on-site installed wood fibre panels on the outside of a timber frame façade presented to the building stock as well as an ETICS system
Exterior walls in the elevated parking area in the basement
Specification of the main masses:
The following key positions are included:
• approx. 1,100 m2 of mineral finishing plaster
• approx. 1,100 m2 of Sol silicate façade paint
• approx. 450 m2 ETICS with mineral top plaster and façade painting Sol silicate