1) Information on the construction project:
- General description
On the federally owned property Stresemannstrasse / Erna-Berger-Strasse / Niederkirchnerstrasse in the Berlin borough of Mitte, a new extension building including the outdoor facilities is to be planned for the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU), which will also serve as a federal flagship project for sustainable construction should.
Office space for use by other federal ministries and the Berlin House of Representatives is also to be planned on the property. The sponsor and sponsor is the Federal Real Estate Agency (BImA). The goal is to compact the property so that maximum utilization can be achieved.
There are a total of approximately 29,600 m
The extension should act as an exemplary federal project for sustainable construction. For this reason, the quality level gold of the Federal Assessment System for Sustainable Building (BNB) can be achieved for the building. A minimum level of silver (BNB) is striven for for the new outdoor facilities. As far as the location of the building plot allows, the aim should be to reduce the building's energy requirements as much as possible and to generate as much energy as possible on site.
The comfort conditions to be created in the building should be achieved naturally. This means that robust, low-maintenance, structural solutions are preferable to technical solutions. Technical solutions should only be used if this is not possible (low-tech approach). Particular attention should be paid to reducing the operating and usage costs of the property:
- Client: Federal Real Estate Office - BEFN 8000,
- Users: Federal Ministry for the Environment, Nature Conservation and Nuclear Safety - ZI 4, Federal Real Estate Agency - BEFN 5000,
- Building use: ministerial office and administration building with canteen and conference area,
- Type of construction: new building,
- GFA: max. 54 800 m
- Project costs (net) acc. DIN 276 (overall project):
—— KG 200-600: 148 185,000 EUR,
KG 300: EUR 98 529 000.
- Project duration: 11 years 2019-2030
2) Subject of the order:
- Range of services: Object planning, engineering structure of the construction pit according to § 41 ff HOAI,
- Service profile Lph 2-8, HZ: III, basic services, special services: waste and pollutant management,
- Start / end of service provision: probably 08 / 2020-12 / 2023.
A gradual award of the services is planned. However, there is no legal claim to the transfer of all services.