Regional network system Westeifel, laying of a water transport line as well as broadband conduits between the connection structure Scharfbillig and the elevated reservoir Niersch.
Landwerke Eifel are planning the further expansion of the network with which the drinking water supply line is to be continued in the above-mentioned route section. In addition, conduits for broadband use are to be laid in a shared trench.
- Laying of a water transport pipeline DN 300 in GGG, approx. 11 500 m,
- Laying empty conduits (2x d50) for fiber-optic cables in PE, approx. 11 500 m,
- Production of 8 road / water crossings using the drilling press method / flush drilling method,
- Civil engineering and road construction work in connection with the laying of the lines including the delivery of the media pipes,
- Surveying work for the staking out of the axes as well as the existing survey,
- Investigation of ordnance and, if necessary, removal of anomalies or ordnance.