The measure "lock Schwabenheim, repair chamber walls right chamber" essentially comprises the massive repair of the chamber walls and the renewal of the lock equipment.
Section 1: Repair right-hand chamber
The chamber walls of the right-hand chamber are repaired and receive a new facing concrete shell. In this course, the existing coves for the subsequent extension of the right chamber are removed. The walls are secured by anchors in the concrete.
The inner walls are completely rebuilt and the planias renewed. The lighting masts are moved to the new locations, taking into account the extension of the right-hand chamber.
In addition, 2 new surveying pillars will be installed as well as a collision guard at the lower and upper head.
Section 2: lock equipment right chamber
The lock equipment is completely renewed and additionally swimming bollards as well as a Einfahrhilfe for climbers built. The classification of the lock device takes into account the later extension of the right-hand chamber.
Section 3: Outdoor facilities
The outdoor facilities include demolition work, the construction of a site road, temporary laying of cables, the construction of the construction site and storage areas as well as the clearing of the construction site for the new technical building.