Bridge construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 December 2022
Closing Date:
14 March 2023
Location(s):
DEA59 Olpe (DE Germany/DEUTSCHLAND)
Description:
L512/L539 near Attendorn, replacement of the Ihne viaduct with the construction of a turbo roundabout

The existing Ihnetal bridge on the L512 has to be replaced by a replacement building.

The replacement of the bridge will take place next to the existing structure. Traffic management will be maintained on the existing structure. After completion of the new approx. 83 m long bridge (2-span structure as prestressed plate beam), it must be connected to the road network. For this purpose, a new turbo roundabout must be built immediately adjacent to the new bridge and further superstructure work must be carried out.

In the course of the new road layout, 4 new retaining structures and 3 large traffic sign carriers must be built.

After the new bridge is under traffic, the existing bridge, including the supporting tower emergency support underneath, can be dismantled.

FOR PART A: LANDESBETRIEB STRASSENBAU NRW

ca. 850 m3 steel and prestressed concrete demolition of the existing structure

ca. 420 t Steel load-bearing tower for emergency support dismantling and recycling

ca. 730 m2 formwork floor v. vorh. Load-bearing tower Emergency support Fig. + verw.

ca. 12.800 m3 Baugrubenaushub

ca. 810 m2 construction pit shoring by shotcrete protection + nailing

ca. 950 m2 steel sheet piling

ca. 485 m2 girder wall (anchored back)

ca. 440 m in-situ concrete bored pile DN 1.2 m

ca. Production of 4,700 m3 of reinforced concrete

ca. Installing 1,000 t of reinforcing steel

ca. Installing 95 t of prestressing steel

like. 1.810 m2 Überbauabdichtung

ca. 1,545 m2 GA - protective and top layer

7 St Elastomerlager

1 Psch shoring incl. foundation manufacture

Installing approx. 10,350 m3 of earth material (building backfill or backfill).

Baugrubenverfüllung)

ca. 3,000 m3 earthworks with pavement demolition

ca. 690 m of pipelines DN 150 - 400 killed

ca. 15 pcs shafts DN 1000 - 1500

ca. 34 St Regeneinläufe

like. 4,000 m3 Frostschutzschicht

ca. 6,650 m2 asphalt base course made of AC 32 TS

ca. 6,650 m2 asphalt binder course made of AC BS

ca. 6,650 m2 asphalt surface course made of SMA 8S

FOR PART B: CITY OF ATTENDORN:

ca. 100 m channel 300 Sb

ca. 40 m channel 500 Sb

like. 30 m Kanalverlegung 250 B/PVC

like. 9 St Schachtbauwerke DN 1000 - 1200 in Beton Fertigteilbauweise