On the school grounds of Pater-Wilhelm-Fink-Straße 18, an extension is to be built with a connection to the existing building: Drywall construction trade DIN 18340 Execution period: KW 38/2020 - KW 17/2021:
The primary and middle school of Rottenburg ad Laaber is located at Pater-Wilhelm-Fink Straße 18. An extension to the school is to be built on the associated school playground. A connecting corridor should also be created between the existing and the new building. The following approximate information is relevant for the measure:
- 400 m
- 150 m
- 200 m
- 1 500 m