Lot 1 – Pre-stage expansion Industrial area: Trade drainage: Waste water and rainwater pipes approx. 545 running metres DN 250 to DN 400 PP, approx. 380 running metres DN 800 to DN 1400 SB incl. shaft components etc., approx. 80 running metres House connection pipes DN 160 to DN 200 PP; Water supply trade: approx. 480 running meters Two-layer pipes PE 100-RC DA 250, SDR11 incl. fittings and fittings; Road construction trade: approx. 6,920 sqm soil improvement, approx. 3,980 sqm asphalt work, approx. 1,780 running metres on-board systems, approx. 1,070 sqm paving work. Lot 2 - Pre-stage expansion Residential area: Trade drainage: Waste water and rainwater pipes approx. 1,960 running metres DN 250 to 630 PP incl. shaft components, approx. 560 running metres House connection pipes DN 160 to DN 200; Water supply trade: approx. 1,300 running meters PE 100-RC DA 110-250, SDR11 incl. fittings and fittings; Road construction trade: approx. 12,940 sqm soil improvement, approx. 3,700 sqm asphalt work, approx. 2,370 running metres on-board systems; Lot 3 - Production P+R in the final stage: approx. 1,360 sqm soil improvement, approx. 860 sqm paving work, approx. 330 running metres on-board systems, various ancillary work
Lot 1 – Pre-stage expansion Industrial area: Trade drainage: Waste water and rainwater pipes approx. 545 running metres DN 250 to DN 400 PP, approx. 380 running metres DN 800 to DN 1400 SB incl. shaft components etc., approx. 80 running metres House connection pipes DN 160 to DN 200 PP; Water supply trade: approx. 480 running meters Two-layer pipes PE 100-RC DA 250, SDR11 incl. fittings and fittings; Road construction trade: approx. 6,920 sqm soil improvement, approx. 3,980 sqm asphalt work, approx. 1,780 running metres on-board systems, approx. 1,070 sqm paving work. Lot 2 - Pre-stage expansion Residential area: Trade drainage: Waste water and rainwater pipes approx. 1,960 running metres DN 250 to 630 PP incl. shaft components, approx. 560 running metres House connection pipes DN 160 to DN 200; Water supply trade: approx. 1,300 running meters PE 100-RC DA 110-250, SDR11 incl. fittings and fittings; Road construction trade: approx. 12,940 sqm soil improvement, approx. 3,700 sqm asphalt work, approx. 2,370 running metres on-board systems; Lot 3 - Production P+R in the final stage: approx. 1,360 sqm soil improvement, approx. 860 sqm paving work, approx. 330 running metres on-board systems, various ancillary work