Production of a new lightning protection system and earthing system with a collection device in the flat roof area. Drains are plastered on the wall façade and laid in concrete. The safety lines are designed in ALU with roof pipe holder. Furthermore, roof structures are to be protected by means of safety rods
1400m Erdleitung V4A
900m Fundamenterder
500m discharges on façade
1000m Fangleitung
2800m potential control lines in ceilings
Production of a new lightning protection system and earthing system with a collection device in the flat roof area. Drains are plastered on the wall façade and laid in concrete. The safety lines are designed in ALU with roof pipe holder. Furthermore, roof structures are to be protected by means of safety rods