realization of works to make buildings classified as ERP accessible and to ensure safety against the risks of fire and panic of disabled people admitted to the ERP - EIFFEL high school in CERNAY
VRD - demolition - structural work - construction site installationstructural work, adaptation,
complete or partial demolition and ancillary works
metal joinery - locksmithlocksmith and metalwork and ancillary works
Interior carpentryinterior carpentry and ancillary works
plastering - finishespartitioning work, painting work, and various interior finishes
tiles - earthenware - soft floorslaying tiles and earthenware, soft floors
electricitywork on high current and low current electrical installations as part of PMR compliance
sanitary - heating - ventilationthe adaptation of the premises to people with reduced mobility (Pmr) including:
- removal and evacuation of obsolete equipment not reused in the restructured premises,
- sanitary appliances and accessories necessary for restructured premises,
- collection and disposal of sewage and waste water from replaced or new equipment on existing drainage networks,
- cold water and hot water connection of replaced or new equipment, on existing networks nearby.
- the displacements, modifications and/or replacements of heating equipment necessary for the restructuring of the premises, including various adaptations
Elevatorbringing the elevator into conformity
Indoor and outdoor signagesupply and installation of interior and exterior signage, and ancillary works