Construction of an overpass type structure at the current RN 141 and crossing the 2 x 2 lane project. It includes:
- earthworks of the work (excavations),
- the realization of the structure of art (PSDP),
- the recovery of the embankments of the SNCF platform,
- the demolition of the provisional diversion of the RN 141 including the recommissioning of the RN 141 under this PS,
- the constitution of a sanitation of diameter 500 in bottom of arase,
- the demolition of the access track to the SNCF structure,
- the constitution after demolition of the temporary deviation of the continuity of the excavation D0,
- The realization of treated arase including protective coating.
RN 141 - set up 2 x 2 lanes between Roumazières and Exideuil - construction of the engineering structure PS RN 141.