Expansion of the Landsberg sewage treatment plant; BA 1.2

Construction of the pump house, secondary clarifier equipment

The following services are to be provided, among others:

- Pump house:

• Construction of an excavation pit of 13.45 m x 11.05 m x 9.0 m (LxWxH) with 460 m² sheet piling and loosening holes

• Lowering of groundwater by means of deep wells and filter lances

• Construction of pump house in floor plan 7.60 x 8.60 m with ground floor and basement

• Basement made of reinforced concrete with a ceiling height of 3.90 m

• 335 m² formwork work including various recesses and cable bushings

• 65 m³ WU-Concrete, XA1, XC4, XD2, XF3, Feuchtigkeitsklasse WF

• 21.5 m³ Concrete, XA1, XC4, XD2, XF3, Feuchtigkeitsklasse WF

• 11 t reinforcing steel B 500 B

• 3 return slurry pumps (block pumps) with 61 m³/h - 255 m³/h and 1.6-7.0m head

•2 excess sludge pumps (eccentric screw pumps) with 10 l/s - 17 l/s and 11.0 m head

• Various stainless steel pipelines up to DN 300, including gate valves / fittings

• Ground floor as a steel construction with sandwich façade, upper edge of the roof 5.20 m above sea level

• Ventilation system

• Single-girder overhead crane with a lifting capacity of 0.5 t

- Secondary clarifier (d= 34m):

• Height-adjustable inlet structure with erection of a king's chair replacement structure

• Shield scraper with floating sludge removal (4 floor clearing blades, floating sludge clearing auger with trigger device, chassis with rack, scraper walkway as solid wall construction)

• Drainage channel with serrated weir and drain funnel made of stainless steel (length approx. 107 m, gutter width 0.5m)

- Distribution structure/sampling and measuring shaft:

• Installation of spindle plate gate valves (DN600/500) in distributor and sample measuring shaft

- Rohrleitungsarbeiten:

• Laying of underground pipelines, 52 m 560x33.2 SDR17 PE-HD

• Laying of underground pipelines, 103 m 710x42.1 SDR17 PE-HD

• Laying of underground pipelines, 45m 180x10,7 SDR17 PE-HD

• Laying of underground pipelines, 10 m 125x11.4 SDR17 PE-HD

• Laying of underground cable conduits PE-HD da110 of approx. 1,050m

• Construction of 7 underground cable protection shafts, base depth 2m below GOK

- EMSR technology

• Pressure measuring points on the pressure pipelines of the pumps

• Quality and flow measurements in pipelines and manholes

• Installation and equipping of EI&C cabinets (7 pieces à 800x600x2000, WxDxH) including the entire cabling of the electr. Equipment

• Construction of a central PLC for the sewage treatment plant

Download full details as .pdf
The Buyer:
Wasser- und Abwasserzweckverband Saalkreis
CPV Code(s):
45231300 - Construction work for water and sewage pipelines