Project management service for the construction of new infrastructures on the CEA / Gramat detonation experimental sites.
This market includes three stations with two sub-stations one firm and one optional:
- station 1: site A:
—— sub-item 1.1: studies of site A (firm part);
—— sub-item 1.2: monitoring of the construction for site A (optional part);
- station 2: site B:
—— sub-item 2.1: detailed study and calculation note (firm part);
—— sub-item 2.2: assistance in the notification of performance contracts (optional part);
- station 3: analysis building:
—— sub-item 3.1 study of the analysis building (firm part);
—— sub-item 3.2: monitoring of the implementation for the analysis building (optional part).
Works to be carried out:
- works on site A: closed and independent worksite decree 94:
—— construction of a TCE tertiary building of approximately 70 m
—— construction of a TCE storage building in a metal frame and cladding on a concrete slab of approximately 300 m
—— construction and redevelopment of roads and various networks (fluid and electricity);
—— realization of pit and tank;
—— construction of a concrete slab 30 m × 30 m;
—— renovation of a few small buildings;
- work on site B:
—— construction of a removable modular building in reinforced concrete of about 200 m
—— modification of an existing slab to accommodate the building (if necessary);
—— construction of two or three TCE type Algéco buildings improved to measure;
—— bring in utilities (electricity, water, drainage, etc.);
- works on site C:
—— construction of a metal frame / cladding building on a TCE concrete slab or renovation of an existing building;
—— concerned trades:
——— earthworks and VRD;
——— structural work and waterproofing;
——— metal frame and cladding;
——— Finishing work and secondary trades type: carpentry, locksmithing, painting and floor covering;
--- electricity;
——— CVC.