The contract concerns the construction of a set of 13 buildings, representing more than 200,000 square meters of surface in Work. The overall lead time for the work (in progress) is approximately 5 years. These works are allocated both geographically, in 4 blocks, and technically, in macro-lots and separate lots (see presentation grid of lots at Ccap). Lots starting with "0" refer to transversal lots covering several geographical blocks. The project integrates a proactive environmental approach of the CHU (energy performance, geothermal energy, low-nuisance construction site, etc.) and a professional integration approach for people in difficulty in cooperation with Nantes Métropole.
Access control: about 2000 badge readers, intrusion: about 6 control panels and 10 detection areasvideo surveillance: Full IP, about 400 indoor fixed cameras, 100 outdoor fixed cameras, 8 multidirectional cameras + PTZ dome, 80 multidirectional cameras 2 lenses ... Videophone and sound system: Full IP about 200 videophones; 200 HpParking assistance: about 900 light indicator sensorsSafety supervision: dedicated solution with about 50,000 points and interface with hypervision