Reconstruction of cubature facilities of the Left Bank Sewage Treatment Plant in Poznań - Stage V, the scope of which includes the design and execution of internal reprofiling of concrete surfaces and the application of new chemically resistant coatings of the walls and bottom of overflow channels and overflow edges in secondary sedimentation tanks - ob. 06.1 and 06.2 – approx. 780 m2.
Reconstruction of cubature facilities of the Left Bank Sewage Treatment Plant in Poznań - Stage V, the scope of which includes the design and execution of internal reprofiling of concrete surfaces and the application of new chemically resistant coatings of the walls and bottom of overflow channels and overflow edges in secondary sedimentation tanks - ob. 06.1 and 06.2 – approx. 780 m2.