Heavy renovation for the creation of a new location
LOT 1: Structural work, completions, surroundings, coordination of lots;
LOT 2: Sanitary, heating, ventilation;
LOT 3: Electricity.
LOT 1: Structural work, completions, surroundings, batch coordinationIn more detail, the work includes:
- Demolition of the annex – park side;
- Asbestos removal;
- Construction of an extension (park side);
- Replacement and insulation of the roof;
- Replacement of exterior joinery;
- Insulation of gables;
- All interior fittings and finishing works (partitions, false ceilings, floor and wall coverings, interior joinery, plaster, paintings, ...);
- Replacement of the heating system;
- Placement of double flow ventilation groups;
- Compliance of the electrical installation, including elevator and reinforcement of the Medium Voltage cabin;
- Installation of a generalized fire detection system;
- All compartmentalization work and compliance with fire protection and firefighting;
-Surroundings:
o Construction of 3 courtyards;
o Development of accesses, playgrounds and a vegetable garden;
o Development of a car park (20 spaces with charging stations), including pedestrian easement for access to the sports hall of the City of Liège;
o Landscaping of outdoor bleachers.
LOT 2: sanitary, heating, ventilationIn more detail, the work includes:
- Demolition of the annex – park side;
- Asbestos removal;
- Construction of an extension (park side);
- Replacement and insulation of the roof;
- Replacement of exterior joinery;
- Insulation of gables;
- All interior fittings and finishing works (partitions, false ceilings, floor and wall coverings, interior joinery, plaster, paintings, ...);
- Replacement of the heating system;
- Placement of double flow ventilation groups;
- Compliance of the electrical installation, including elevator and reinforcement of the Medium Voltage cabin;
- Installation of a generalized fire detection system;
- All compartmentalization work and compliance with fire protection and firefighting;
-Surroundings:
o Construction of 3 courtyards;
o Development of accesses, playgrounds and a vegetable garden;
o Development of a car park (20 spaces with charging stations), including pedestrian easement for access to the sports hall of the City of Liège;
o Landscaping of outdoor bleachers.
LOT 3: electricityIn more detail, the work includes:
- Demolition of the annex – park side;
- Asbestos removal;
- Construction of an extension (park side);
- Replacement and insulation of the roof;
- Replacement of exterior joinery;
- Insulation of gables;
- All interior fittings and finishing works (partitions, false ceilings, floor and wall coverings, interior joinery, plaster, paintings, ...);
- Replacement of the heating system;
- Placement of double flow ventilation groups;
- Compliance of the electrical installation, including elevator and reinforcement of the Medium Voltage cabin;
- Installation of a generalized fire detection system;
- All compartmentalization work and compliance with fire protection and firefighting;
-Surroundings:
o Construction of 3 courtyards;
o Development of accesses, playgrounds and a vegetable garden;
o Development of a car park (20 spaces with charging stations), including pedestrian easement for access to the sports hall of the City of Liège;
o Landscaping of outdoor bleachers.