- Automated continuous monitoring of 2 bridge structures.
The aim of the automated continuous monitoring is the recording of sudden changes in the structure of the materials, which are triggered by mechanical loads and their influence on the load bearing behavior. The records should also provide information on the structural integrity of the structures.
For the project referred to in point II.1.4) of this notice, the following main services must be provided:
- The aim of automated continuous monitoring is the recording of sudden changes in the structure of the materials, which are triggered by mechanical loads and their influence on the load bearing behavior. In addition, the records should provide information on the structural integrity of the structures in order to be able to carry out suitable measures to maintain the structural behavior based on the nature of the damage.
- the entire continuous monitoring system is to be delivered, installed and operated over the contractual period and dismantled without residue after the end of the operating period,
- The boundary conditions as well as the requirements for the operation of the system are to be taken from the execution description.