The existing Ei-Profilkanal 900/1350 in the Papiermühle district, section Schlosstalstrasse to Wieshofstrasse, is in poor structural condition and must be rebuilt. The planned new pipeline course has a total length of around 292 m and a depth of 5 – 6 m, which is located exclusively on private land. Stadtwerk Winterthur intends to replace gas and water pipes at the same time.
The existing Ei-Profilkanal 900/1350 in the Papiermühle district, section Schlosstalstrasse to Wieshofstrasse, is in poor structural condition and must be rebuilt. The planned new pipeline course has a total length of around 292 m and a depth of 5 – 6 m, which is located exclusively on private land. Stadtwerk Winterthur intends to replace gas and water pipes at the same time.