Onshore Power Supply for Cruise (OPS) | Tenderlake

Onshore Power Supply for Cruise (OPS)

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 June 2026
Closing Date:
27 July 2026
Location(s):
IS001 Höfuðborgarsvæði (IS Iceland/ÍSLAND)
Assessment:
This notice contains 1 positive AI Assessment(s) of your products/services' relevance for this procurements.  
Sign in to Tenderlake with your Pro or Primary account to read the assessments.
Description:
The project involves the installation of two Onshore Power Supply systems rated at 12 MVA each, designed to facilitate power supply for cruise ships through modular, stackable container solutions.

The Owner intends to install two (2) Onshore Power Supply (OPS) systems, each rated at 12 MVA. Power supply from grid supply at 33 kV, output from OPS shall be 11/6.6 kV and capable of operating at 50/60 Hz. The installation will comprise two connection zones, and each zone will have three (3) connection points serving a single cruise ship.
The Owner is seeking modular solution-based on up to a maximum container size of 30-foot modules stackable to a maximum height of three. The design shall consider all applicable load conditions and seismic forces that the structure may be subjected to, according to specification in this document and other applicable specifications.
The OPS containers assembly will be enclosed with a structure which will be built by Other.
This tender is for the OPS power transformation system, and electrical engineering for shore side connection cabinets, and the overall testing of the systems. This is better described in document “101462-010-SPE-001 technical specification”.


LOT-0001
Onshore Power Supply for Cruise (OPS).
The Owner intends to install two (2) Onshore Power Supply (OPS) systems, each rated at 12 MVA. Power supply from grid supply at 33 kV, output from OPS shall be 11/6.6 kV and capable of operating at 50/60 Hz. The installation will comprise two connection zones, and each zone will have three (3) connection points serving a single cruise ship.
The Owner is seeking modular solution-based on up to a maximum container size of 30-foot modules stackable to a maximum height of three. The design shall consider all applicable load conditions and seismic forces that the structure may be subjected to, according to specification in this document and other applicable specifications.
The OPS containers assembly will be enclosed with a structure which will be built by Other.
This tender is for the OPS power transformation system, and electrical engineering for shore side connection cabinets, and the overall testing of the systems. This is better described in document “101462-010-SPE-001 technical specification”.

The Buyer:
Faxaflóahafnir sf.
Additional information:
Link:
Additional document: Onshore Power Supply for Cruise (OPS)
Link:
View Full Notice
Link:
Download Full Notice as PDF
CPV Code(s):
31600000 - Electrical equipment and apparatus