A 643 A643, AK Schierst. -Sheer. Bridge, line, A 643, UF L 3842, BW 7, AS Wiesbaden Äppelallee
Road constructionapprox. 12,000 m³ of earthwork including dam removal and embankment
approx. 15,000 m² of asphalt work
400 m DN 150 PVC, 600 m DN 300 PVC, 250 m DN 400 PVC drainage pipe
approx. 25 m pipe penetration DN 300 under the A 643
bridge constructionReplacement building, Bauwerk 7
2 substructures with a clear width of 21.75 m
Total bridge area: approx. 1,000 m²
Prestressed concrete elements with in-situ concrete addition
Deep foundation with 48 bored piles diam. 120 cm, approx. 23 m each
FurnishingBarriers, concrete walls for highways
ordnanceapprox. 12000 m² surface sounding up to 5 m deep
approx. 86000 m of exploratory drilling 5 m to 11 m depth
Traffic safetySet up, maintain and remove traffic safety for motorways (yellow marking and transportable protective devices).