BIM surveying during planning, BIM planning (OP building Lph 1-4, optionally Lph 5-7; structural engineering Lph 1-4, optionally Lph 5-6; TGA planning KG 410-480 lph 1-4, optionally Lph 5-7).
Surveying services and BIM inventory modelling for lots 2 and 3Surveying services and BIM inventory modelling all performance levels.
BIM planning fire protection tech. upgrade Lph 1-4, option lph 5-7Property planning building Lph 1-4, structural engineering Lph 1-4, specialist planning TGA Lph 1-4 (KG410 water wastewater, KG430 RLT smoke extraction, KG440 50Hz, KG450 TK-BMA-SAA, KG460 MTA, KG470 usage peak. equipment, KG480 GA).
Property planning Building Lph 1-4, structural engineering Lph 1-4, specialist planning TGA Lph 1-4 (KG410 water wastewater, KG430 RLT smoke extraction, KG440 50Hz, KG480 GA).