Sanitärarbeiten (23 and 0167)
KG 410: Water and sewage systems
Complete renovation of an accommodation building of the German Armed Forces. The building consists of sections A, B and C. The buildings are arranged in a U-shape and connected to each other. Building sections A and B have a very similar structure and each consist of a building with a gable roof with UG, EG, OG and DG. They form the side legs of the U. Building section C with basement and upper floor connects buildings A and B laterally with its front sides at the upper ends. The supply of building part C is carried out from the adjacent buildings A and B, with the separation in the middle.
After gutting, the entire sewage and water installation will be rebuilt. Two new drinking water feeds are being fed in. There will be 98 residential units in hotel standard. Each unit has its own sanitary cabin with shower, toilet and sink. There are also common rooms, kitchenettes and a washing machine room. Drainage is carried out to the outside via elevated sewers in the basement. The water supply is provided by two central domestic hot water heating systems via fresh water systems.
Material excerpt plus accessories: approx. 610 m sewage pipe DN 110, approx. 350 m sewage pipe DN 160, approx. 80 m sewage pipe DN 125, approx. 225 m sewage pipe DN 75, approx. 450 sewage pipe DN 50, approx. 285 m sewage pipe DN 40, 7 underfloor small lifting stations, approx. 50 m sewage pipe DN 32, approx. 80 m stainless steel pipe AD 42, approx. 95 m stainless steel pipe AD 35, approx. 165 m stainless steel pipe AD 28, approx. 210 m stainless steel pipe AD 22, approx. 385 m stainless steel pipe AD 18, approx. 1860 m stainless steel pipe AD 15.
Conclusion of a maintenance contract.