Infra II A Transport facilities and drainage
As part of the new construction of an office and laboratory building for the Julius Kühn Institute (JKI) in Dossenheim, parts of the outdoor facilities are to be built in the north-western area in Infra II A. This includes the following essential services: demolish approx. 3,300 m² of fastening without binding agents, installing approx. 390 m³ of stored soil, approx. 870 m³ of excavation for paved areas and backfilling, approx. 200 m³ of excavation and backfilling for drainage pipes, approx. 200 m trench for lighting cables, approx. 8 pieces. Foundations for lighting masts and bollard lights, approx. 160 m drainage pipes PP DN 160-315, approx. 120 m drainage channels, approx. 7 pcs. Road drains, approx. 300 m² asphalt Bk 1.0, approx. 235 m² asphalt bk 0.3, approx. 960 m² paving d = 10 cm, approx. 480 m² paving d = 8 cm, approx. 400 m curb, approx. 120 m eaves stone, 9 pcs. planting pits and 24 pcs. Bike racks.