Cycle path construction work

Contract Value:
PLN 10M - 10M
Notice Type:
Contract Notice
Published Date:
18 March 2022
Closing Date:
14 April 2022
Location(s):
PL228 Bytomski (PL Poland/POLSKA)
Description:
Construction of an integrated interchange hub at Pope John Paul II Street together with bicycle paths (...)

Part 1 - Cycling route No. 1 section A2 — from Ks. J. Popiełuszki Street to Pope John Pawła II Street

Part 2 - Cycling route no. 1 section A3 — from Pope John Paul II Street to the GDD named after J. Wieczorek (plot no. 254/62)

Part 3 - Cycling route No. 23 section A1 — along Gen. St. Maczka Street, from the junction of Pope John Paul II Street with Gen. St. Maczka Street to the connection with Route 1 (Olimpijska Street)

Part 4 - Cycling route no. 13 — along Pope John Paul II Street, from the junction of Pope John Paul II Street with Gen. St. Maczka Street to J. Wieczorek (plot 172)

Part 5 - Making pictograms on street surfaces: Okrzei, Kalwaryjska, Skargi, Copernicus, Sunny, Sportowy in Piekarach Silesian

Cycle route no. 1 section A2 — from Ks. J. Popiełuszki Street to Pope Jana Pawła II Street

Completion of cycle route No. 1 on section A2 (length approx. 0.46 km)

As part of the section of cycle route no. 1 shall be performed:

- demolition works, among others, the demolition of pavement from mineral mixtures of gr. min. 4cm on an area of approx. 904,00 m2, demolition of pavement of mineral mixtures of min. 10cm on an area of approx. 168,00 m2, demolition of existing pavement made of concrete cube 8 cm thick on the surface of approx. 798,00 m2, milling of existing bituminous pavement at a depth of min. up to 4 cm on an area of approx. 216,00 m2, demolition of curbs 15x30 cm on a length of approx. 395,00 mb, demolition of edging 8x30 cm on a length of approx. 926,00 mb, demolition of fences type U-12a at a length of approx. 12,00 m;

- cycling path with mineral and bituminous pavement on a total area of approx. 1075,00 m2;

- surfaces of downhill and replacement of the abrasive layer of mineral and bituminous mixture on an area of approx. 384,00m2;

- paving pavements of concrete with a total area of approx. 1360,00 m2;

- edge elements, i.e. laying concrete edges in the amount of approx. 1473,00 mb and concrete curbs in the amount of approx. 339,00 mb;

- adjustment/replacement/disassembly of existing equipment;

- reconstruction and construction of rainwater drains;

- protection of electricity and gas networks;

- reconstruction and protection of electricity networks;

- making felling of trees and shrubs and making plantings

Repeated works - scope of the order: preparatory, demolition, dismantling, earth, assembly, construction, installation, network, electricity, surface, road, restoration, landscaping, greenery and finishing works, concerning:

• cycle route No. 1 section A2,

• reconstruction and protection of electricity networks,

• security of gas networks,

• landscaping,

• execution of clipping and replacement plantings.

- conditions for award: execution of the scope of works in connection with the need to remove adverse field conditions encountered during the execution of works (land quality, physical field obstacles or formal and legal obstacles), removal of formal and legal obstacles, maintenance laws, random situations, requirements of authorities or third parties, ensuring functionality and ensuring the safety of users,

- estimated value: PLN 105 354.05 net.

Where materials, equipment, products or equivalent solutions are used, the Contractor shall be obliged to indicate them in the offer - a full description of SWZ.

Pursuant to Article 100 u.p.z.p., the Ordering Party adequately to the subject of the contract ensures availability for all users, including those with disabilities and, taking into account these requirements, draw up a description of the subject matter of the order

- full description contains SWZ.Type of activities related to the execution of the contract, which concern employment requirements on the basis of the employment relationship by the Contractor or subcontractor of persons carrying out activities during the execution of the contract: preparatory, demolition, dismantling, earth works, assembly, construction, installation, mains, electricity, surface, road, recreation, landscaping, greenery works and finishing works - full description contains SWZ.In accordance with Article 35 (2) (1)) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908, as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ. Wadium - 30 000,00 PLN.

Cycling route no. 1 section A3 — from Pope John Paul II Street to J. Wieczorek GDD (plot no. 254/62)

Completion of cycle route 1 on the section A3 (length approx. 1.22 km)

As part of the section of cycle route no. 1, perform:

- demolition works, among others, the demolition of pavement from mineral mixtures of gr. min. 4cm on an area of approx. 1308,00 m2, demolition of pavement of mineral mixtures of approx. 10cm on an area of approx. 2334,00 m2, demolition of existing pavement made of concrete cube 8 cm thick on the surface of approx. 2334,00 m2, demolition of existing pavement made of concrete cube 8 cm 1055,00 m2, milling of existing bitumen pavement at the depth of min. up to 4 cm on an area of approx. 848,00 m2, demolition of curbs 15x30 cm on a length of approx. 897.00 mb, demolition of the existing fence approx. 16,00 mb, demolition of the existing fence with an area of approx. 16,00 m2;

- bicycle path/walking and bicycle train with a surface of mineral and bituminous mixture on a total area of approx. 2934,00 m2;

- exit surfaces and replacement of the abrasive layer of mineral and bituminous mixture on an area of approx. 2772,00m2;

- paving pavements of concrete with a total area of approx. 3068,00 m2;

- parking spaces made of concrete paving with a total area of approx. 490,00m2;

- edge elements i.e. laying concrete edges in the amount of approx. 3378,00 mb and concrete curbs in the amount of approx. 1163,00 mb;

- adjustment/replacement/disassembly of existing equipment;

- reconstruction and construction of rainwater drains;

- reconstruction and protection of electricity networks;

- reconstruction and construction of street lighting;

- protection of electricity and gas networks;

- making felling of trees and shrubs and making replacement plantings;

- execution of the target organization of the movement.

Repeated works - scope of the order: preparatory, demolition, dismantling, earth, assembly, construction, installation, network, power, lighting, surface, road, recreation, landscaping, greenery and finishing works, concerning:

• cycle route No. 1 section A3,

• reconstruction and protection of electricity networks,

• security of gas networks,

• street lighting,

• landscaping,

• execution of clipping and replacement plantings.

- conditions for award: execution of the scope of works in connection with the need to remove adverse field conditions encountered during the execution of works (land quality, physical field obstacles or formal and legal obstacles), removal of formal and legal obstacles, maintenance laws, random situations, requirements of authorities or third parties, ensuring functionality and ensuring the safety of users,

-Value of this order: 357 996,20 PLN net.

Where materials, equipment, products or equivalent solutions are used, the Contractor shall be obliged to indicate them in the offer - a full description of SWZ.

Pursuant to Article 100 u.p.z.p., the Ordering Party adequately to the subject of the contract ensures availability for all users, including those with disabilities and, taking into account these requirements, draw up a description of the subject matter of the order

- Full description of SWZ. Type of activities related to the execution of the contract, which concern employment requirements on the basis of the employment relationship by the Contractor or subcontractor of persons performing activities during the execution of the order: full description of SWZ..

Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10% and from 1 January 2025 at least 30%, - full description of the SWZ. Wadium - 100 000,00 PLN.

Cycling route No. 23 section A1 — along Gen. St. Maczka Street, from the junction of Pope John Pawła II Street with Gen. St. Maczka Street to the connection with Route 1 (Olimpijska Street)

Completion of cycle route number 23 on section A1 (length approx. 0.62 km)

As part of the section of cycle route number 23, perform:

- demolition works, among others, the demolition of pavement from mineral mixtures of gr. min. 4cm on an area of approx. 57,00 m2, demolition of pavement from mineral mixtures of approx. 10cm on an area of approx. 150,00 m2, demolition of existing pavement made of concrete cube 8 cm thick on an area of approx. 1075 ,00 m2, milling of existing bituminous pavement at a depth of min. up to 4 cm on an area of approx. 150,00 m2, demolition of curbs 15x30 cm on a length of approx. 431,00 mb, demolition of existing pots and replacement of concrete advertising pole;

- cycling path with a surface of mineral and bituminous mixture on a total area of approx. 1452,00 m2;

- replacement of the abrasive layer of mineral and bituminous mixture on an area of approx. 300,00m2;

- paving pavements of concrete with a total area of approx. 969,00 m2;

- retaining wall of prefabricated elements with a length of approx. 55,00mb;

- edge elements, i.e. laying concrete edges in the amount of approx. 1339,00 mb and concrete curbs in the amount of approx. 384,00 mb;

- adjustment/replacement/dismantling of existing equipment;

- reconstruction of rainwater and sanitary sewage system;

- reconstruction and protection of the water supply network;

- reconstruction and protection of electricity networks;

- reconstruction and construction of street lighting;

- protection of electricity and gas networks;

- making felling of trees and shrubs and making replacement plantings;

- execution of the target organization of the movement.

Repeated works - preparatory, demolition, dismantling, earth, assembly, construction, installation, network, electricity, lighting, surface, road, restoration, landscaping - full description includes SWZ. Value of this order: PLN 119 818,34 net.

Where materials, equipment, products or equivalent solutions are used, the Contractor shall be obliged to indicate them in the offer - a full description of SWZ. Pursuant to Art. 100 u.p.z.p., the Ordering Party adequately to the subject of the contract ensures availability for all users, including disabled persons and, taking into account these requirements, draw up a description of the subject of the order - full description of SWZ. c) Type of activities related to the execution contracts concerned with employment requirements on the basis of the employment relationship by the Contractor or subcontractor of persons performing activities during the execution of the contract: preparatory, demolition, dismantling, earth, assembly, construction, installation, network, electricity works, lighting, surface, road, recreation, landscaping, greenery works and finishing works full description of the SWZ.Pursuant to Article 35 (2) (1)) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 of late. d.) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ. Wadium - 30 000,00 PLN.

Cycling route no. 13 — along Pope John Paul II Street, from the junction of Pope John Paul II Street from Gen. St. Maczka Street to J. Wieczorek (plot 172)

Completion of cycle route number 13 (length approx. 0.44 km)

As part of the section of cycle route no. 13, perform:

- demolition works, among others, the demolition of pavement from mineral mixtures of approx. 10cm on an area of approx. 656,00 m2, demolition of existing pavement made of concrete cube 8 cm thick on an area of approx. 2035,00 m2, milling of existing bituminous pavement at a depth of up to 4 cm on the surface of approx. 2035,00 m2. approx. 2353,00 m2, demolition of curbs 15x30 cm on a length of approx. 828,00 mb, demolition of edging 8x30 cm at a length of approx. 720.00 mb, demolition of concrete curb sewage at a length of approx. 219,00 m;

- bicycle path/walking and bicycle train with a surface of mineral and bituminous mixture on a total area of approx. 1373,00 m2;

- replacement of the abrasive layer of mineral and bituminous mixture on an area of approx. 2802,00m2;

- paving pavements of concrete with a total area of approx. 1487,00 m2;

- edge elements i.e. laying concrete edges in the amount of approx. 990,00 mb and concrete curbs in the amount of approx. 765,00 mb;

- adjustment/replacement/dismantling of existing equipment;

- reconstruction of rainwater drains;

- reconstruction and protection of electricity networks;

- reconstruction of telecommunications networks;

- reconstruction of street lighting;

- protection of electricity and gas networks;

- making felling of trees and shrubs and making replacement plantings;

- execution of the target organization of the movement.

Repeated works: preparatory, demolition, dismantling, earth, assembly, construction, installation, network, electricity, lighting, surface, road, recreation, landscaping, greenery and finishing works. Value of this order: 223 009,63 zł net - full description includes SWZ. Where materials, equipment, products or equivalent solutions are used, the Contractor shall be obliged to indicate them in the offer - a full description of SWZ. Pursuant to Art. 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including disabled persons and, taking into account these requirements, draw up a description of the subject of the order - a full description of the SWZ. The type of activities related to the execution of the contract concerned with employment requirements on the basis of the employment relationship by the Contractor or subcontractor of persons performing activities during the execution of the contract: preparatory, demolition, dismantling, earth, assembly, construction works, installation, mains, electricity, lighting, surface, road, recreation, landscaping, greenery works and finishing works - full description of SWZ. Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10% and from 1 January 2025 at least 30% - full description of the SWZ. Wadium - 60 000,00 PLN.

Making pictograms on street surfaces: Okrzea, Kalwaryjska, Skargi, Copernicus, Sunny, Sportowy in Piekara Śląskie

Production of pictograms type P-27 on street surfaces: Okrzei, Kalwaryjska, Skargi, Copernicus, Sunny, Sportowa in Piekara Śląskie

Within the part of the subject of the order shall be executed:

- at M. Kopernika Street (Route 1) marking of the roadway surface with signs of type P-27 made of chemetting masses, thick-layer, white color — in the amount of approx. 22 pieces;

- on P. Skargi Street (Route 1) marking the roadway surface with signs of type P-27 made of chemical, thick-layer masses, white color — in the amount of approx. 13 pieces;

- on S. Okrzei Street (Route 3) marking the roadway surface with P-27 type signs made of chemetting masses, thick-layer, white color — in the amount of approx. 16 pieces;

- Kalwaryjska Street (Route 7) marking the roadway surface with signs of type P-27 made of chemetting masses, thick-layer, white color — in the amount of approx. 25 pieces;

- on Słoneczna Street (Route 13) marking the roadway surface with signs of type P-27 made of chemical, thick-layer masses, white color — in the amount of approx. 24 pieces;

- on Sportowa Street (Route 23) marking the roadway surface with signs of type P-27 made of chemical, thick-layer masses, white color — in the amount of approx. 12 pieces;

Repeated works - preparatory works, horizontal marking on surfaces using chemetting, thick-layer masses concerning:

•performance of pictograms on the surface of the streets: Okrzea, Kalwaryjska, Skargi, Copernicus Słoneczna, Sportowa in Piekary Śląskie. Value of this order: 1 384,05 zł net. - Full description includes SWZ. Where materials, equipment, products or equivalent solutions are used, the Contractor shall be obliged to indicate them in the offer - a full description of SWZ. Pursuant to Article 100 u.p.z.p., the Ordering Party adequately to the subject of the order ensures availability for all users, including those with disabilities and, taking into account these requirements, shall draw up a description of this subject of the order - full description includes SWZ. Type of activities related to the execution of the contract concerned with employment requirements on the basis of the employment relationship by the Contractor or subcontractor of persons performing activities during the execution of the contract: preparatory works, performance of horizontal marking on surfaces by means of masses Chemoretting, thick-layer, white color, in the range of: performance of pictograms on the surface of streets: Okrzea, Kalwaryjska, Skargi, Copernicus, Słoneczna, Sportowa in Piekarach Śląskie. Pursuant to Articles 35 (2) (1) and 68 (3) of the Act of 11 January 2018 on electromobility and alternative fuels (Journal of Laws of 2020, item 908 as amended) The Contracting Authority shall order the task covered by this proceeding (Contractors) whose share of electric vehicles or natural gas fuelled vehicles in the fleet of vehicles used in the performance of that task (public procurement) will be from 1 January 2022 at least 10%, and from 1 January 2025 at least 30% - full description includes SWZ.

Download full details as .pdf