VE 11 – Bauhauptleistungen
Track, civil engineering and road construction, traffic managementRoad construction
13,350 m2 of paving asphalt pavements
Accommodate 1,450 m2 paving ceilings
350 m2 of natural stone slab covering
2,330 m kerbs
Absorb 1,405 m of paving strips
4,450 m3 of base courses without binders
4,050 m2 of soil
700 m3 of soil replacement
13,500 m2 of grade
550 m connecting cable DN 150
65 pcs of road drains
Produce 1,120 m3 of frost protection layers
Producing 1,360 m2 of gravel base layers
Producing 9,910 m2 of asphalt base courses
Producing 8,600 m2 of asphalt binder courses
Producing 9,910 m2 of asphalt surface courses
8,600 m2 of hydraulically bonded base courses
Making 270 m2 paving with concrete block paving
1,300 m2 paving surface with large natural stone paving
Making 1,800 m2 paving ceiling with mosaic paving
Produce 432 m2 of slab covering with natural stone slabs
320 m of concrete kerbs
640 m curbs made of natural stone 15/30 set
1,695 m curbs made of natural stone 32/20
Set 72 m bus kerbstones
Making 880 m of strips with paving stones
1,050 m of gutter with concrete block paving
Make signage
Making road markings
Stadtmöbilierung
Dismantling and installation of street lighting
Dismantling traffic lights
Civil engineering traffic lights / street lighting
Planting 26 large trees
track construction
Removing and recycling 1,200 mSch grooved rails
90 mGl track construction expansion and recycling
Removing 500 m2 of large-area concrete slabs
Removing 130 pcs of large composite panels
1,400 m2 of asphalt paving with concrete
Mounting 350 m2 paving surface with concrete
620 m of concrete kerbstones
Remove and recycle 50 drainage boxes
800 m3 of setting pack layer
2,800 m3 of base courses without binders
1,700 m3 of soil
350 m of drainage pipe
Making 8 pcs drainage shafts
6,400 m2 of fine grade
Produce 600 m3 frost protection layers
Producing 700 m3 of gravel base layers
800 m3 of flowing concrete production
Producing 3,800 m2 concrete base course
5,100 m2 of asphalt base courses
5,100 m2 of asphalt binder courses
5,100 m2 of asphalt surface courses of mastic asphalt
1,400 mGl Rheda City-D production
Make 410 mGl covered cross-sleeper
330 mGl grass track production
120 mGl track constructions
Install 40 pcs of rail drainage boxes
Install 18 pieces of track drainage boxes
Installing 1,000 m of track board
HALTESTELLENBAU
Accommodate 600 m2 paving surface
Removing 100 m2 of concrete track edge strips
Break off 500 m curb
Upgrading 240 m of platform elements
340 m of paving strips
Absorb 150 m3 of base courses without binders
50 m3 of soil
40 m3 floor replacement
725 m2 of grade
Produce 150 m3 of frost protection layers
Laying 550 m2 concrete block paving
Making 200 m of paving strips
540 m curbs
Set 55 m platform element
Set 165 m pimpled shelf
Haltestellenausstattung
Haltestellenbeleuchtung
CIVIL ENGINEERING TRACTION CURRENT
900 m3 of trench
Installing 3,100 m of cable conduits
Install 5 pcs cable ducts
CIVIL ENGINEERING E-SUPPLY
240 m3 of trench
Installing 1,550 m of cable conduits
Install 18 cable ducts
FahrleitungsbauCatenary
Dismantling 2,000 m of contact wire
Dismantle 20 pcs cross panels
Dismantle 10 sheets
Dismantle 4 section separators
Dismantle 22 pcs mast
Mount 1,750 m contact wire
20 pcs Fastening Wall Bracket Making
20 pcs. Checking and renovating the wall bracket
Install 20 pcs cross-field bracing
Assemble 10 pcs transverse structure
18 pcs mast mount