The tendered construction work includes services for preparatory measures in construction phase 5 of the 2nd north-south connection in Magdeburg.
Which includes:
- building clearance
- Sewer construction of Abwassergesellschaft Magdeburg mbH
- House connections of Städtische Werke Magdeburg GmbH & Co.KG
- Construction of a privacy wall
Construction site clearanceServices of construction site clearance according to specifications
Wastewater AGM‐ Sewer construction MP profile 2.000 / 1.250 GRP approx. 355 m, depth up to and including 6.00m, incl. 3 pcs.
Tangential shafts as a special structure
‐ Sewer construction DN 800 - DN 1,000 reinforced concrete approx. 260 m, depth up to and including 4.75 m incl. 7
Inspection shafts DN1.500 - DN2.000
‐ Canal construction DN 500 reinforced concrete approx. 27 m, depth up to and including 3.50 m
‐ Canal construction DN 400 Stoneware approx. 310 m, depth up to and including 4.75 m incl. 6 pcs.
inspection shafts
‐ Sewer construction DN 200 Stoneware approx. 55 m, depth up to and including 4.00 m, incl. 4 pcs.
inspection shafts
‐ Dismantling and securing / backfilling of old plants
‐ Selective sewer repairs
‐ Selective rehabilitation of shaft structures
Drinking water and ELT SWMDrinking water - civil engineering and assembly services, material supply for:
1. Conversion of 6 pieces of drinking water house connection pipes including water meter shafts,
Construction length up to and including 10 m, depth up to and including 2.00 m
ELT -Construction of low-voltage cables incl. position KVS, length approx. 115 m
SichtschutzwandServices for the production of a privacy wall according to the specifications