In the course of the expansion and renovation of the primary and secondary school complex,
renewed and restored the adjacent and connected open areas/break yards.
The construction project is divided into five consecutive construction phases (from 2022 to 2024).
These are spatially separated from each other and are mainly processed during school operation.
The tasks mainly concern ground work, concrete pavement work, the production of sports grounds, steel work and tree planting.
Topfloor work 1200 m²
3000m³ earthworks
Concrete paving/concrete slab work 3900m²
Asphalt work 2730m²
EPDM floor coverings 2130m²
Lawn joint work 480m²
Lawn work 690m²
Planting work 1035m²
Tree planting 68pcs
Block steps concrete 176 pieces
Precast concrete parts 3pcs
steelwork - div. Railings, ramp borders, grates, platforms
Lighting - pole lights, bollards, handrail lights, floor spotlights