Drainage and agricultural utilization of municipal sewage sludge of wastewater treatment plants Südheide GmbH.
Period 1.1.2020-31.12.2023:
- Wastewater treatment plant Faßberg (extension 22 000 PE),
- sewage sludge dewatered 20-22% TR 600 t,
- sewage sludge liquid 4-5% TR 2 000 m
- Eschede WWTP (extension 9 000 PE),
- sewage sludge dehydrated 20-22% TR 400 t,
- sewage sludge liquid 4-5% TR 3 200 m
- Wastewater treatment plant Lachendorf (extension 18 000 PE),
- sewage sludge dehydrated 20-22% TR 800 t,
- sewage sludge liquid 4-5% TR 6 000 m
- Wastewater treatment plant Wienhausen (extension 16 000 PE),
- sewage sludge dewatered 20-22% TR 700 t,
- sewage sludge liquid 4-5% TR 8 000 m
- Winsen (Aller) Wastewater Treatment Plant (extension size 25 000 pe),
- sewage sludge dewatered 20-22% TR 1 500 t,
- sewage sludge liquid 4-5% TR 14 800 m
- WWTP Hambühren (extension 16 000 PE),
- Sewage sludge dewatered 20-22% TR 1 600 t.
Drainage and agricultural utilization of municipal sewage sludge of wastewater treatment plants Südheide GmbH.
Period 1.1.2020-31.12.2023:
- Wastewater treatment plant Faßberg (extension 22 000 PE),
- sewage sludge dehydrated 20-22% TR 600 t.,
- sewage sludge liquid 4-5% TR 2 000 m
- Eschede WWTP (extension 9 000 PE),
- sewage sludge dehydrated 20-22% TR 400 t.,
- sewage sludge liquid 4-5% TR 3 200 m
- Wastewater treatment plant Lachendorf (extension 18 000 PE),
- sewage sludge dehydrated 20-22% TR 800 t.,
- sewage sludge liquid 4-5% TR 6 000 m
- Wastewater treatment plant Wienhausen (extension 16 000 PE),
- sewage sludge dehydrated 20-22% TR 700 t.,
- sewage sludge liquid 4-5% TR 8 000 m
- Winsen (Aller) Wastewater Treatment Plant (extension size 25 000 pe),
- sewage sludge dewatered 20-22% TR 1 500 t.,
- sewage sludge liquid 4-5% TR 14 800 m
- WWTP Hambühren (extension 16 000 PE),
- Sewage sludge dewatered 20-22% TR 1 600 t.