Planning services for the construction of a new parking facility in Darmstadt FDK, phases 5-7+9, Lot 1: Rail transport system planning incl. drainage, Lot 2: Road transport system planning including drainage, Lot 3: Engineering structures and structural engineering, Lot 4: Technical retraction equipment and overhead lines, Lot 5: Object and structural planning of buildings, Lot 6: Technical equipment
Lot 1: Rail transport system planning incl. drainageConstruction of a new storage and treatment facility on the site of a former marshalling yard in the immediate vicinity of Darmstadt-Kranichstein station. The storage and treatment facility will consist of seven tracks as well as an interior cleaning system and an exterior cleaning facility. For a direct connection from the direction of Darmstadt Hauptbahnhof, switch adjustments are necessary at Darmstadt Nord station, which are also to be planned. The required storage areas as well as the social rooms necessary for the personnel deployed will also be built as part of the project.
Planning services for the new construction of the Darmstadt FDK parking facility, phases 5-7+9, the planning services are divided into 6 lots.
Lot 1: Rail transport system planning including drainage,
Lot 1 includes the planning of the rail transport facility including drainage. Planning objects are platforms, corridor conveyor routes, tracks, track ends, platform roof foundations, throughputs, switches and the associated drainage systems.
The basic assignment is the provision of the HOAI Lph. 5.
Lot 2: Road traffic facility planning incl. drainageConstruction of a new storage and treatment facility on the site of a former marshalling yard in the immediate vicinity of Darmstadt-Kranichstein station. The storage and treatment facility will consist of seven tracks as well as an interior cleaning system and an exterior cleaning facility. For a direct connection from the direction of Darmstadt Hauptbahnhof, switch adjustments are necessary at Darmstadt Nord station, which are also to be planned. The required storage areas as well as the social rooms necessary for the personnel deployed will also be built as part of the project.
Planning services for the new construction of the Darmstadt FDK parking facility, phases 5-7+9, the planning services are divided into 6 lots.
Lot 2: Road traffic facility planning incl. drainage,
Lot 2 includes the planning of the road traffic facility including drainage. Planning objects are parking lots, container parking spaces, infiltration basins and trenches, paths and roads as well as the associated drainage systems.
The basic assignment is the provision of the HOAI Lph. 5.
Lot 3: Engineering structures and structural designConstruction of a new storage and treatment facility on the site of a former marshalling yard in the immediate vicinity of Darmstadt-Kranichstein station. The storage and treatment facility will consist of seven tracks as well as an interior cleaning system and an exterior cleaning facility. For a direct connection from the direction of Darmstadt Hauptbahnhof, switch adjustments are necessary at Darmstadt Nord station, which are also to be planned. The required storage areas as well as the social rooms necessary for the personnel deployed will also be built as part of the project.
Planning services for the new construction of the Darmstadt FDK parking facility, phases 5-7+9, the planning services are divided into 6 lots.
Lot 3: Engineering structures and structural engineering,
Lot 3 includes engineering and structural engineering. Planning objects are retaining walls, drinking water supply, extinguishing water supply, fence and gate system
Optional planning object 1: Platform roof
Optional planning object 2: Elevator shaft social building
The basic assignment is the provision of HOAI Lph. 5 Object Planning and Structural Engineering.
Lot 4: technical track equipment and overhead lineConstruction of a new storage and treatment facility on the site of a former marshalling yard in the immediate vicinity of Darmstadt-Kranichstein station. The storage and treatment facility will consist of seven tracks as well as an interior cleaning system and an exterior cleaning facility. For a direct connection from the direction of Darmstadt Hauptbahnhof, switch adjustments are necessary at Darmstadt Nord station, which are also to be planned. The required storage areas as well as the social rooms necessary for the personnel deployed will also be built as part of the project.
Planning services for the new construction of the Darmstadt FDK parking facility, phases 5-7+9, the planning services are divided into 6 lots.
Lot 4: technical track equipment and overhead lines,
Lot 4 includes the planning of the overhead line equipment. Planning objects are the overhead line systems of the tracks of the parking and treatment facilities, the transfer connection and the overhead conductor rail in the WWTP.
The basic assignment is the provision of the HOAI Lph. 5.
Lot 5: Object and structural design of buildingsConstruction of a new storage and treatment facility on the site of a former marshalling yard in the immediate vicinity of Darmstadt-Kranichstein station. The storage and treatment facility will consist of seven tracks as well as an interior cleaning system and an exterior cleaning facility. For a direct connection from the direction of Darmstadt Hauptbahnhof, switch adjustments are necessary at Darmstadt Nord station, which are also to be planned. The required storage areas as well as the social rooms necessary for the personnel deployed will also be built as part of the project.
Planning services for the new construction of the Darmstadt FDK parking facility, phases 5-7+9, the planning services are divided into 6 lots.
Lot 5: Object and structural design of buildings,
Lot 5 includes the project planning and structural design of buildings. The planning objects are the social building, warehouse, WWTP building, shelter for industrial trucks, transformer enclosure and toilet facilities.
The basic assignment is the provision of HOAI Lph. 5 Object Planning and Structural Engineering.
Construction of a new storage and treatment facility on the site of a former marshalling yard in the immediate vicinity of Darmstadt-Kranichstein station. The storage and treatment facility will consist of seven tracks as well as an interior cleaning system and an exterior cleaning facility. For a direct connection from the direction of Darmstadt Hauptbahnhof, switch adjustments are necessary at Darmstadt Nord station, which are also to be planned. The required storage areas as well as the social rooms necessary for the personnel deployed will also be built as part of the project.
Planning services for the new construction of the Darmstadt FDK parking facility, phases 5-7+9, the planning services are divided into 6 lots.
Lot 6: Technical equipment
Lot 6 includes the planning of the technical equipment. Planning objects are lighting of the entire system, traction power systems of the entire system, point heaters incl. concrete substation, 50 Hz platforms and tracks, communication, security and information technology systems Tracks and platforms (without LST), charging stations, video system, water and sewage supply Social buildings, WWTP, water and sewage supply Toilet facilities, low-voltage installation systems Social buildings, warehouses incl. automation, lighting systems Social buildings, warehouses, WWTP, Lightning protection and earthing systems, Social buildings, Warehouses, WWTP, Heating, cooling, ventilation, Social buildings, Communication technology, Gate system / pedestrian separation system, Charging points for e-cars
Optional planning object 1: Photovoltaic system
The basic assignment is the provision of the HOAI Lph. 5.