Provision of planning services per lot for the adaptation, expansion and/or upgrading of the high-voltage network (110 kV grid) in the greater Offenbach area.
P05 UW DietzenbachPlanning services for the renewal and expansion of the 110kV switchgear at the Dietzenbach substation.
The project is essentially divided into the following areas:
- Renewal and expansion of the 110kV switchgear
- Construction of a 110kV transformer
- Installation of a 110 kV earth fault extinguishing coil
- Renewal of a 20kV earth fault extinguishing coil
- Installation of a 20 kV earth fault extinguishing coil
P16 UW OstPlanning services for the new construction of the UW Offenbach Ost substation.
P18 UW SprendlingenPlanning services for the renewal and expansion of the 110kV switchgear at the Sprendlingen substation.
The project is essentially divided into the following areas:
- Renewal of the 110kV switchgear
- Expansion of the 110kV switchgear by two additional fields
P19 UW LangenPlanning services for the renewal and expansion of the 110 kV and 20 kV switchgear in the Langen substation.
The project is essentially divided into the following areas:
- Renewal of the 110kV switchgear
- Renewal and expansion of the 20kV switchgear
- Renewal of the 20kV earth fault extinguishing coils.
P22 UW Neu IsenburgPlanning services for the new construction of the Neu Isenburg substation.