Complete renovation Rathaus Potsdam, VE 33.2 - Heating, ventilation, sanitary 2nd BA, floor 0
- Renewal of heating distribution in the ground floor area EC (approx. 1,000 m steel pipe, welded including thermal insulation)
- Renovation of 4 overlying toilet units and installation of a shower area in the DG (30 objects including pipes and pre-wall elements)
- Renewal of a ventilation climb with 4 single-room fans