New construction of a pressure pipe, sewage treatment plant Nieder-Gemünden
Performance picture of civil engineering works according to § 43 HOAI (2013)
LP 1 to 8, commissioning gradually.
Planning services for the construction of a waste water pressure line with pumping station from the sewage treatment plant Nieder-Gemünden to the district sewage treatment plant Nieder-Ohmen.
Achievement picture engineering structures according to § 43 HOAI (2013) LP 1 to 8, commissioning step by step.
The municipal sewage treatment plant in the district Nieder-Gemünden no longer meets the technical requirements for wastewater disposal and should be shut down. It is planned to build a waste water pressure line with pumping station to connect the wastewater treatment plant Nieder-Gemünden with the district sewage treatment plant Nieder-Ohmen. The pressure line is about 4.1 km long. At the lowest point (about 215 m above sea level) at the wastewater treatment plant Nieder-Gemünden, the pumping station is planned. The highest point (245 m above sea level) is located at the end of the pressure line, at the inlet to the district sewage treatment plant Nieder-Ohmen. The planned route has 5 high and 4 low points.
Special services are reserved by the client as required. A claim for commissioning does not exist.