golbey_Caserne Haxo_Phase 1 Asbestos removal and deconstruction work, pollution management work
lot no. 01: Asbestos removal and deconstructionpre-cleaning and cleaning before asbestos removal; Asbestos removal; Final cleaning and internal deconstruction (according to the requirements of this Cctp); The deconstruction of the structures and buildings present on this right-of-way; Sorting and disposal to appropriate treatment or recovery centres of the waste produced
lot 02: Pollution managementexcavation at the right of the former fuel distribution track (see Figure 9) of the source zone of concentrated contamination (Zs2) in C10-C40 hydrocarbons and BTEX; Off-site disposal of contaminated soil excavated at the right of the source zone Zs2 in adapted chain;