BZU23 Elevated platform P55, Nebikon, Aarburg-Oftringen

Nebikon train station:

- Demolition of the surface 600 m 2 ,

- Demolition of platform elements 1 240 m 2 ,

- Rühl walls 250 m 2 ,

- Excavation of platform construction (fixed) 1 670 m 3 ,

- Excavation of construction pit (fixed) 630 m 3 ,

- Create foundation layer (loose) 1 100 m 3 ,

- Bulk material (loose) 1 900 m 3 ,

- asphalt pavement 630 t,

- composite stones 100 m 2 ,

- platform angle 480 m,

- PBD sealing 40 m 2 ,

- drainage pipes 300 m,

- drainage channels 340 m,

- Inspection shafts / road gullies 6 St.,

- lighting foundations 20 pcs.,

- catenary foundations 10 pieces,

- Platform roofs 520 m 2 ,

- Structural concrete 410 m 3 ,

- Formwork 1 370 m 2 ,

- reinforcement 52 t,

- Auxiliary barriers 1 000 m 2 .

Aarburg-Oftringen train station:

- Demolition of surface 2 300 m 2 ,

- Excavation of platform construction (fixed) 1,060 m 3 ,

- Create a foundation layer (loose) 1 260 m 3 ,

- Bulk material (loose) 500 m 3 ,

- asphalt pavement 580 t,

- platform extension bracket 540 m,

- platform angle 150 m,

- drainage pipes 400 m,

- drainage channels 430 m,

- Inspection shafts / road drains 10 pieces,

- lighting foundations 18 pieces,

- Foundations of catenary / signals 2 pieces,

- Platform roof extension 110 m 2 ,

- Structural concrete 220 m 3 ,

- Formwork 610 m 2 ,

- reinforcement 23 t,

- Auxiliary locks 470 m 2 .

Nebikon train station:

- Demolition of the surface 600 m 2 ,

- Demolition of platform elements 1 240 m 2 ,

- Rühl walls 250 m 2 ,

- Excavation of platform construction (fixed) 1 670 m 3 ,

- Excavation of construction pit (fixed) 630 m 3 ,

- Create foundation layer (loose) 1 100 m 3 ,

- Bulk material (loose) 1 900 m 3 ,

- asphalt pavement 630 t,

- composite stones 100 m 2 ,

- platform angle 480 m,

- PBD sealing 40 m 2 ,

- drainage pipes 300 m,

- drainage channels 340 m,

- Inspection shafts / road gullies 6 St.,

- lighting foundations 20 pcs.,

- catenary foundations 10 pieces,

- Platform roofs 520 m 2 ,

- Structural concrete 410 m 3 ,

- Formwork 1 370 m 2 ,

- reinforcement 52 t,

- Auxiliary barriers 1 000 m 2 .

Aarburg-Oftringen train station:

- Demolition of surface 2 300 m 2 ,

- Excavation of platform construction (fixed) 1,060 m 3 ,

- Create a foundation layer (loose) 1 260 m 3 ,

- Bulk material (loose) 500 m 3 ,

- asphalt pavement 580 t,

- platform extension bracket 540 m,

- platform angle 150 m,

- drainage pipes 400 m,

- drainage channels 430 m,

- Inspection shafts / street drains 10 St.,

- lighting foundations 18 pieces,

- Foundations of catenary / signals 2 pieces,

- Platform roof extension 110 m 2 ,

- Structural concrete 220 m 3 ,

- Formwork 610 m 2 ,

- reinforcement 23 t,

- Auxiliary locks 470 m 2 .