Nebikon train station:
- Demolition of the surface 600 m
- Demolition of platform elements 1 240 m
- Rühl walls 250 m
- Excavation of platform construction (fixed) 1 670 m
- Excavation of construction pit (fixed) 630 m
- Create foundation layer (loose) 1 100 m
- Bulk material (loose) 1 900 m
- asphalt pavement 630 t,
- composite stones 100 m
- platform angle 480 m,
- PBD sealing 40 m
- drainage pipes 300 m,
- drainage channels 340 m,
- Inspection shafts / road gullies 6 St.,
- lighting foundations 20 pcs.,
- catenary foundations 10 pieces,
- Platform roofs 520 m
- Structural concrete 410 m
- Formwork 1 370 m
- reinforcement 52 t,
- Auxiliary barriers 1 000 m
Aarburg-Oftringen train station:
- Demolition of surface 2 300 m
- Excavation of platform construction (fixed) 1,060 m
- Create a foundation layer (loose) 1 260 m
- Bulk material (loose) 500 m
- asphalt pavement 580 t,
- platform extension bracket 540 m,
- platform angle 150 m,
- drainage pipes 400 m,
- drainage channels 430 m,
- Inspection shafts / road drains 10 pieces,
- lighting foundations 18 pieces,
- Foundations of catenary / signals 2 pieces,
- Platform roof extension 110 m
- Structural concrete 220 m
- Formwork 610 m
- reinforcement 23 t,
- Auxiliary locks 470 m
Nebikon train station:
- Demolition of the surface 600 m
- Demolition of platform elements 1 240 m
- Rühl walls 250 m
- Excavation of platform construction (fixed) 1 670 m
- Excavation of construction pit (fixed) 630 m
- Create foundation layer (loose) 1 100 m
- Bulk material (loose) 1 900 m
- asphalt pavement 630 t,
- composite stones 100 m
- platform angle 480 m,
- PBD sealing 40 m
- drainage pipes 300 m,
- drainage channels 340 m,
- Inspection shafts / road gullies 6 St.,
- lighting foundations 20 pcs.,
- catenary foundations 10 pieces,
- Platform roofs 520 m
- Structural concrete 410 m
- Formwork 1 370 m
- reinforcement 52 t,
- Auxiliary barriers 1 000 m
Aarburg-Oftringen train station:
- Demolition of surface 2 300 m
- Excavation of platform construction (fixed) 1,060 m
- Create a foundation layer (loose) 1 260 m
- Bulk material (loose) 500 m
- asphalt pavement 580 t,
- platform extension bracket 540 m,
- platform angle 150 m,
- drainage pipes 400 m,
- drainage channels 430 m,
- Inspection shafts / street drains 10 St.,
- lighting foundations 18 pieces,
- Foundations of catenary / signals 2 pieces,
- Platform roof extension 110 m
- Structural concrete 220 m
- Formwork 610 m
- reinforcement 23 t,
- Auxiliary locks 470 m