The (having) installation of PV installations at 3 locations of the province of Flevoland, namely museum Batavialand in Lelystad and its subsidiary offices Dronten and Zeewolde.
Where the external installation date including turnkey delivery for the museum Batavialand is 31 July 2022 and for the subsidiary branches Dronten and Zeewolde by 1 October 2022 at the latest.
The (having) installation of PV installations at 3 locations of the province of Flevoland, namely museum Batavialand in Lelystad and its subsidiary offices Dronten and Zeewolde.
Where the external installation date including turnkey delivery for the museum Batavialand is 31 July 2022 and for the subsidiary branches Dronten and Zeewolde by 1 October 2022 at the latest.