It is planned to acquire the design and construction works of water treatment facilities at Kleboniškis water well.
(1) the general part:
1.1) engineering research;
1.2) project preparation;
1.3) performance of project supervision;
1.4) commissioning and adjustment works;
1.5) operating and maintenance instructions, staff training;
1.6) Execution drawings and cadastral measurements;
2) technological building:
2.1) general construction works;
2.2) technological equipment and its installation;
2.3) Electrical and automatic control equipment and installation;
2.4) heating, ventilation and plumbing of the building;
2.5) installation of building security and fire alarm systems;
(3) water treatment plants:
3.1) co-construction works;
3.2) technological equipment and its installation;
3.3) Electrical and automatic control equipment and installation;
(4) clean water tanks:
4.1) general construction works;
4.2) technological equipment and its installation;
4.3) Electrical and automatic control equipment and installation;
(5) second lift pumping station:
5.1) general construction works;
5.2) technological equipment and its installation;
5.3) Electrical and automatic control equipment and installation;
5.4) heating, ventilation and plumbing of the building;
5.5) installation of building security and fire alarm systems;
(6) Wash tank:
6.1) general construction works;
6.2) technological equipment and its installation;
6.3) Electrical and automatic control equipment and installation;
7) field work:
7.1) installation of outdoor networks;
7.2) hard pavement road and pavement, pavement pavements;
7.3) fencing of facilities and installation of gates;
7.4) lighting of the territory, installation of security system;
7.5) tree and shrub removal, well-being in the construction site;
8. dismantling and demolition:
8.1) demolition of existing buildings;
8.2) dismantling of existing tanks;
8.3) dismantling existing networks.