The municipal company Stadtwerke Weiden idOpf is responsible for the new construction of the depot.
The new depot to be built is directly adjacent to the new construction of the waterworks.
The depot is located between Neustädter-Straße and Georg-Stöckel-Straße in the north of the city.
- Suspended ceilings: 1050 m²
- metal stand walls: 325 m²
- Endtrays: 180 m²
- metal installation walls: 125 m²
- acoustic ceiling sails, glass wool: 60 pcs.
- acoustic wall panel system, glass wool: 26 m²
- Acoustic wall covering, wood wool multilayer board: 80 m²
- acoustic ceiling covering, wood wool multilayer board: 45 m²
- Carrier cladding gypsum fleece sheets, vertical Ceiling Skirting, outdoor use: 250 m²
- base covering gypsum fleece panels, suspended ceiling, outdoor application: 120 m²