demolition work
Verbauarbeiten
Clearance, clearing out and total demolition of the existing Carl Steinmeier middle school, UG, ground floor, approx. 29 650 m 3 , including pollutant remediation, recovery and disposal.
- about 650 m 2 Carrier screed walls, 3-sided Berlin shoring, beam depth up to 16 m, shoring height up to 8.60 m, in parts with rear anchoring Version before demolition UG. Vorhaltung shoring also for shell of the new building swimming pool with gym until before. 03/2020
- about 17 100 m 3 excavation,
- about 3 000 m 3 Fillings Workrooms in the installation area.