The object of the order is construction works consisting in the restoration of reservoirs and construction of new water equipment in the area of Forest Forest Area of Szczukwin forestry. The Ordering Party divided the item of the order into 2 parts.
Construction works in the field of water engineering in the territory of the Szczukvin_3Execution of construction works covering its scope:
• Construction of water equipment — construction of water reservoirs:
Construction of retention tank No. 3
• Execution of water devices - robots in the waters of rz. Little View, involving the demolition of old ones and the construction of new culverts:
Demolition of existing and construction of new B-5 culvert
Demolition of existing and construction of new B-7 culvert
Construction of a new B-8 culvert
Demolition of existing and construction of new B-9 culvert
• Manufacture of water equipment - reconstruction of ditches consisting in:
Ditch MW-7 - Demolition of existing and construction of new B-8.1 culvert
Ditch MW-5- Demolition of existing and construction of new B-6 culvert
Ditch MW-7 - Demolition of existing and construction of new B-10 culvert
Ditch MW-7 - Demolition of existing and construction of new B-13 culvert
Ditch MW-4-1-1-1 - Demolition of existing and construction of new B-11 culvert
Ditch MW-7-5-5 - Demolition of existing and construction of new B-12 culvert
Trench R-7 - Construction of wooden valve B13a
Minimum warranty period for works made: 48 months
The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.
Construction works in the field of water engineering in the territory of the Szczukvin_4Execution of construction works covering its scope:
• Construction of water equipment — construction of water reservoirs:
Expansion and reconstruction of retention tank No. 8
• Manufacture of water equipment - reconstruction of ditches consisting in:
Trench R - Demolition of existing and construction of new B-15 culvert
Ditch R-2 - Demolition of existing and construction of new B-16 culvert
Trench R-2 - Demolition of existing and construction of new B-17 culvert
Trench R-2 - Construction of wooden valve B-17a
Trench R-2 - Construction of B-18 drainage well
Trench R-1-1 - Construction of wooden valve B-19
Minimum warranty period for works made: 48 months
The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.