Troop Quarters Regen
New building 270 lodgings
ELT Installation Building 6
ca. 1.000 m Kabel NYCWY/NYY
approx. 15,000 m cable NYM
ca. 200 m cable NHXH-E30
CA. 3,000 m JE-H(St)H E 30
ca. 1,500 m cable H07RN-F
ca. 3,200 m NT lines
ca. 4,500 m of data lines
800 m Kabelrinnen
ca. 1,000 m of installation pipes, various diameters
Building main distribution with NH load disconnector, surge protection, energy meter, etc.
LV sub-distributions 5 pieces, incl. main switch, surge protection, RCDs, LS machines
ca. 1,300 pieces of installation equipment
1 data distribution cabinet 19", 42 U incl. patch panel 12-f
ca. 450 pcs LED lights
TV system with power supply from on-site satellite system, 90 antenna sockets
for 2 disabled toilets.
Exclusive lightning protection and building automation (separate tenders)
Troop Quarters Regen
New building 270 lodgings
ELT Installation Building 6
ca. 1.000 m Kabel NYCWY/NYY
approx. 15,000 m cable NYM
ca. 200 m cable NHXH-E30
CA. 3,000 m JE-H(St)H E 30
ca. 1,500 m cable H07RN-F
ca. 3,200 m NT lines
ca. 4,500 m of data lines
800 m Kabelrinnen
ca. 1,000 m of installation pipes, various diameters
Building main distribution with NH load disconnector, surge protection, energy meter, etc.
LV sub-distributions 5 pieces, incl. main switch, surge protection, RCDs, LS machines
ca. 1,300 pieces of installation equipment
1 data distribution cabinet 19", 42 U incl. patch panel 12-f
ca. 450 pcs LED lights
TV system with power supply from on-site satellite system, 90 antenna sockets
for 2 disabled toilets.
Exclusive lightning protection and building automation (separate tenders)