New construction of the vocational school centre in Constance - sanitary and dry fire extinguishing systems Building ZG
Service description sanitary, dry fire extinguishing systems includes the following services:
Central Building Area (ZG):
- Drinking water system consisting of approx. 1600 m stainless steel pipe incl. insulation and approx. 600 m metal composite pipe incl. insulation
- Dirty water pipe made of PP approx. 1700 m
- Rainwater pipe made of PE approx. 330 m incl. condensation water insulation
- Pressure boosting system due to the low supply pressure
- Dry fire extinguishing system, approx. 95 m stainless steel pipe and 13 extraction devices, feed-in takes place centrally at the central building. The buried pipeline is installed by the shell construction trade
- Double pump lifting system for drainage of the furnishings under the backwater level Water treatment system for canteen kitchen