Reconstruction of the Villa von Bülow - in the 5-storey building new installations are being carried out on the ground floor, the 1st floor and the 2nd floor. A BMA will be installed in the entire building.
- high voltage system in the building,
- Delivery and installation of lighting fixtures
- safety lighting system,
- telecommunications and information technology systems,
- Sun protection connection,
- Services in the outdoor area.