Building demolition and wrecking work and earthmoving work | Tenderlake

Building demolition and wrecking work and earthmoving work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 March 2022
Closing Date:
11 April 2022
Location(s):
PL921 Radomski (PL Poland/POLSKA)
Description:
Expansion of the existing water reservoir with accompanying equipment implemented as part of the task “Construction of the Budy Augustowskie water reservoir”

The subject of the contract is Expansion of the existing body of water together with accompanying equipment carried out as part of the task: “Construction of the Budy Augustowskie water reservoir implemented as part of the project: “Comprehensive project of adaptation of forests and forestry to climate change — small retention and anti-water erosion in lowland territories”, No 72/2, 73/3, 79, 78/2, Grabowy Las, Stromiec Municipality”.

The subject of the contract is Expansion of the existing body of water together with accompanying equipment carried out as part of the task: “Construction of the Budy Augustowskie water reservoir implemented as part of the project: “Comprehensive project of adaptation of forests and forestry to climate change — small retention and anti-water erosion in lowland territories”, No 72/2, 73/3, 79, 78/2, Grabowy Las, Stromiec Municipality”.

The planned investment is tasked with the performance of engineering works involving the expansion of the water reservoir along with a stretch redevelopment of the course trough immediately below and above the proposed expansion. The expansion canopy of the tank is designed as irregular, with variable slope slope, the maximum depth of the tank at MPP (Maximum Floating Level =NPP (Normal Floating Level) will be 1.6 m. permanent, educated in the form of rapids from stone overhead, which uniting will allow migration in the course. The reservoir escarpments will be sown with grass mixtures up to a minimum of NPP on the drainage side and entirely within the displanting area. Local anti-pressure reinforcements of the bottom and slopes of the reservoir in the area of the inlet into the reservoir of the whole drainage escarpment on the piling causeway from stone overhead are envisaged. In addition, in order to create convenient conditions for reproduction of amphibians, an outcrop of stone overhead on the left bank on a section with a gentle inclination of 1:10 will be made.

The contractor of the task will give a minimum of 60 months quality guarantee and warranties for defects on the works performed. The term of warranty and warranty will be counted from the date of signing of the final protocol for the receipt of construction works.

Download full details as .pdf
The Buyer:
Skarb Państwa - Państwowe Gospodarstwo Leśne Lasy Państwowe - Nadleśnictwo Dobieszyn
CPV Code(s):
45100000 - Site preparation work
45110000 - Building demolition and wrecking work and earthmoving work
45223500 - Reinforced-concrete structures
45243600 - Quay wall construction work
45246400 - Flood-prevention works
45247200 - Construction work for dams and similar fixed structures
45262330 - Concrete repair work