The community of Feldkirchen intends to build a residential complex with lunchtime care, multifunctional room, 2 clusters of senior citizens' homes and an underground car park.
The planning site is located in a residential area that is adjacent to the special use in the east.
In the north, the railway line represents a border with the adjoining industrial park.
The proposed structures encompass a shared courtyard in a relaxed position, which forms the center of the quarter.
Performance dates:
Start on site: 21.04.2022
Completion: 16.01.2023
Core quantities:
Wooden interior doors including block or steel frames and door fittings:
- tube sliding doors, 1 flb., approx. 153 pcs
- Wet room doors, 1 bulb, approx. 108 pcs
- full panel doors, with/ without fire protection/sound insulation requirements, 1 fl., approx. 42 pcs
- full panel doors with fire protection/sound insulation requirements, 2 fls., approx. 2 pcs
- full-span sliding door, 1 flb., approx. 10 pcs
- wooden door elements made of full chip, 3-piece, approx. 17 pcs