Construction of subsidized apartments on the Lechfeld meadows - timber construction
Land and building plot:
Überbaute Grundstücksfläche ca. 13.900 m2
Construction site equipment and storage area approx. 6,900 m2
Subsoil: Topsoil (humus/red layer) on gravel
construction:
Underground parking approx. 4000 m², cellar approx. 2000 m² and
7 stairwell cores, height approx. 11.50 m in reinforced concrete.
Floor slabs and exterior walls in timber construction CLT
On-site services:
Pre-excavation and backfilling of working spaces
Underground car park and staircase cores in reinforced concrete.
Services:
CLT ceilings approx. 12 650 m²
CLT exterior walls approx. 5 200 m²
Exterior wall cladding (insulation/battens/formwork) approx. 5,400 m²
Folding/folding shutters wood approx. 450 pieces
Ausgleichsschüttung ca. 3,400 m²
Waterproofing bituminous and plastic approx. 4.00 m²
Steel construction (girders and columns) approx. 100 tons
Execution:
The timber construction work will be carried out in sections
in each case following the shell