The order includes the repair of the HTS bridge Langenau as well as the ceiling renewal in the connection area.
approx. 782 m³ reinforced concrete demolition (caps incl. parapet)
approx. 913 m³ reinforced concrete (caps incl. parapet)
approx. 113 t reinforcing steel
1 Psch working and protective scaffolding (for caps)
like. 49 m Fahrbahnübergangskonstruktion
approx. 23500 m² cast asphalt (2.5 to 4.5 cm) and asphalt concrete (6-8 cm) milling
ca. 5000 t Asphaltbinderschicht AC 16 B S
ca. 23000 m² Asphaltdeckschicht MA 8 S (3.5 cm)
ca. 7460 m² Überbauabdichtung
approx. 7460 m² cast asphalt protective layer (3.5 cm) and top layer (3.5 cm)
approx. 1011 m² noise barrier